Joint Operation Body (JOB) Pertamina – Medco E&P Tomori Sulawesi is joint operating body between PT Pertamina Hulu Energi and PT Medco E&P Indonesia. We are one of the national oil & gas companies based on Jakarta, Indonesia. Our project in Central Sulawesi offshore (Senoro) has been operating since February 2011. We are currently inviting highly dynamic, self-motivated and committed applicants to apply several positions in challenging work environment as follow:
1. Plan & Schedule Analyst
2. Cost Control Analyst
3. Contract Engineer
4. Document Controller Analyst
5. Instrumentation Inspector
6. Electrical Inspector
7. Civil/Structural/Architectural Inspector
8. QC Inspection Documentation / Expeditor
9. Civil/Structural Engineer
10. Field Engineer – Civil/Structure/Architectural
11. Piping/Mechanical Engineer
12. Pipemill Inspector
13. Process Engineer
14. Drilling/Completion Engineer
General Requirements:
* Bachelor Degree in Chemical Engineering : No 13
* Bachelor Degree in Mechanical/Civil/Chemical/Electrical/Industrial Engineering : No 14
* Minimum 5-10 years working experience in related field
* Bachelor Degree in Engineering (any discipline) : No 1-8
* Bachelor Degree in Civil Engineering : No 9-10
* Bachelor Degree in Mechanical Engineering : No 11
* Bachelor Degree in Metallurgy or Mechanical Engineering : No 12
To apply for above position, please open : http://www.id-recruitment.com/tomori
Submission of recruitment will be closed on 30th November 2011
Only short-listed applicants who apply at above website will be contacted
eka nurhayanto
December 23, 2011 at 2:03 pm
Saya berminat untuk posisi electrical inspector
Berikut CV saya :
Name : Eka Nurhayanto
Address : Perumahan Bumi Rengganis Blok 10C No.35 Rt 95 Gn.Bahagia,
Balikpapan, Kalimantan Timur.
HP : 08164588067
E-mail : Enurhayanto@gmail.com
PERSONAL INFORMATION
Date of birth : October 3¬rd, 1975
Place of birth : Balikpapan
Marital Status : Married
Children : 1
CAREER OBJECTIVE
Exploring opportunities to apply extensive experience in Electrical engineering and Control systems in a challenging career environment where strong communication, troubleshooting, and performance optimization skills can be effectively utilized.
PROFESSIONAL SKILLS
• More Thirteen years of Industrial Electrician.
• Have good skills in:
PLC, RSView32, Panel View and the other SCADA system.
RSLogix5, RSLogix500, RSLogic500, and AI Series Software.
ABB 800XA
SIGMA UOI/UPM
Distributed Power System Automax From Reliance with Access 4000 from CTC.
More than 600 I/O of programmable logic has created.
• Have good skills in Universal Frequency Drive (inverter) for many manufactures.
• 220V to 3300 V, 0.5 kW to 1600 kW Electrical Motor and Starter with Protection equipment’s.
• Experience in Electrical Distribution from 11 kV to 3.3 kV, 660V and 380 V.
• Experience in turbine generator 2 x 65 MW, 11 kV, Wabash Diesel Generator 5 x 2.5 MW, Caterpillar, Cummins and Olympian.
• Experience in Over head crane Canco, Morris, Kone. P&H Portal Crane and Kroll Crane.
• Experience in conveyor system and ship loader system.
• Experience in flow meter, pneumatic, Solenoid valve.
• Good command in English and proficient in Microsoft Office, Visio Drawing and the internet.
PROFESSIONAL EXPERIENCE
PT.Kutai Chip Mill
Chip Industries
Electrical Engineer, August 2011 – November 2011
Job description:
• Take a lead role in ensuring a safety work ethic the implementation.
• Received and evaluate work order and request for installation of a modification to a various electrical systems, peripheral systems and equipment including, estimating cost and time, deification of work orders, delegating tasks, determining necessary action and approving work orders.
• Establishes and maintains a preventive maintenance and emergency response service to including maintaining on-calls list and schedules and evaluating effectiveness.
• Develop and maintain a current STP data base for Mill wide areas.
• Develop a file of standard planes for regularly recurring repair jobs, based on historical experiences.
• Lead a team for an expansion and fabrication.
• Observing and arranging the electrical system and equipment maintenance.
• Research the Electrical system and equipments shortage for effectively Production.
• Arrange the Preventive maintenance schedule.
• To perform other related tasks/duties as directed by immediate management line.
PT. Kertas Nusantara
Pulp Industries
Senior Supervisory, December 2010 – August 2011
Job description:
• Take a lead role in ensuring a safety work ethic the implementation.
• Received and evaluate work order and request for installation of a modification to a various electrical systems, peripheral systems and equipment including, estimating cost and time, deification of work orders, delegating tasks, determining necessary action and approving work orders.
• Establishes and maintains a preventive maintenance and emergency response service to including maintaining on-calls list and schedules and evaluating effectiveness.
• Develop and maintain a current STP data base for Chemical and Air Separator Plant areas.
• Develop and maintain a current STP data base for Pulp Machine and Bale Finishing Plant areas.
• Develop a file of standard planes for regularly recurring repair jobs, based on historical experiences.
• Lead a team for an expansion and fabrication.
• Observing and arranging the electrical system and equipment maintenance.
• Research the Electrical system and equipments shortage for effectively Production.
• Arrange the Preventive maintenance schedule.
• To perform other related tasks/duties as directed by immediate management line.
Supervisory, November 2007 – December2010
Job description:
• Take a lead role in ensuring a safety work ethic the implementation.
• Received and evaluate work order and request for installation of a modification to a various electrical systems, peripheral systems and equipment including, estimating cost and time, deification of work orders, delegating tasks, determining necessary action and approving work orders.
• Establishes and maintains a preventive maintenance and emergency response service to including maintaining on-calls list and schedules and evaluating effectiveness.
• Develop and maintain a current STP data base for Chemical and Air Separator Plant areas
• Develop a file of standard planes for regularly recurring repair jobs, based on historical experiences.
• Lead a team for an expansion and fabrication.
• Observing and arranging the electrical system and equipment maintenance.
• Research the Electrical system and equipments shortage for effectively Production.
• Arrange the Preventive maintenance schedule.
• To perform other related tasks/duties as directed by immediate management line.
Shift Senior Technician, January, 2005 – November 2007
Jobs description:
• Preventive maintenance and troubleshooting of all Electrical system and equipment’s on Mill Wide areas for continues production, include:
Power Distribution Plants, such:
Power boiler plant.
Recovery boiler plant.
Evaporator plant.
Recaust and lime kiln Plant.
Cooling tower plant.
Water intake, water treatment and water effluent plant.
Wood Processing Plants, such:
Kroll crane.
Portal Crane.
Chipping and conveyor line.
Barking and conveyor line.
Pulping Plants, such:
Digester Plant.
Washing Plant.
Bleaching Plant.
Pulp Machine Plant, such:
Pulp machine.
Dryer machine.
Bale Finishing conveyor.
Chemical and Air Separator Plant, such:
Chlorate Plant.
Chloralkali Plant.
Salt Conveyor.
Brine ion exchanger plant
SO2 Plant.
HCL Plant.
Air Separator Plant.
• Main Control Central, 0.5 to 1600 k Watt motor starters with protection system.
• Variable Frequency Drive Reliance, Toshiba, Allen Bradley and Siemens.
• Power Distribution System from 11kV to 3300V and 380V.
• Maintain the control system using SLC 150 Allen Bradley, SLC 500 Allen Bradley with RS Logix500 Software, PLC-5 Allen Bradley with RS Logix5 Software and Simatic5 Siemens.
Technician, July 2003 – January 2005
Job description:
• Preventive maintenance of all Electrical system and equipment’s on Pulp Machine and Bale Finishing section for continues production, such :
Main Control Central, 0.5 to 1600 k Watt motor starters with protection system.
Variable Frequency Drive Reliance, Toshiba, Allen Bradley and Siemens.
Power Distribution System from 11kV to 3300V and 380V.
• Maintain the control system used SLC 150 Allen Bradley, SLC 500 Allen Bradley with RS Logix500 Software, PLC5 Allen Bradley with RS Logix5 Software, Automax Sigma UOI/UPM, Access 4000, Panel View and RSView32.
• Monitored electrical equipment working performance.
• To perform other related tasks/duties as directed by immediate management line.
• Expansion and fabrication.
Technician Tradesman, October 2000 – July 2003
Job Description:
• Preventive maintenance of all Electrical system and equipment’s on all areas by shift work for continues production, such :
Main Control Central, 0.5 to 1600 k Watt motor starters with protection system.
Variable Frequency Drive Reliance, Toshiba, Allen Bradley and Siemens.
Power Distribution System from 11kV to 3300V and 380V.
• Maintain the control system using SLC 150 Allen Bradley, SLC 500 Allen Bradley with RS Logix500 Software, PLC-5 Allen Bradley with RS Logix5 Software and Simatic5 Siemens.
• Assist technician crew to troubleshooting for all electrical equipment in mill.
Technician Apprentice August 1998 – October 2000
Job Description:
• Preventive maintenance of all electrical equipment in Water Intake and Water Treatment Areas, Control system used PLC-5 Allen Bradley with A.I Series Software.
• Maintain the Variable Frequency Drive Toshiba and Allen Bradley.
• Assist technician crew to troubleshooting for all electrical equipment in mill.
CV.Dodivan Utama, Contractor project VICO Indonesia
Instrument Technician July 1997 – September 1997
Job Decription:
• Relocation DCS.
TRAINING
1. PLC Basic Training, March 22 – April 05, 1999 ( 40 Hours ) non Certified
2. Maintaining and Troubleshooting A PLC-5 System Using RS Logix5 Software, May 12, 2000 (24 Hours) Certified.
3. PLC-5 using RS Logix 5 Software and RS View32 (32 Hours) Certified.
4. Transformer and Rectifier 90 k Amp. (16 Hours) Without certificate.
5. MIMS OE for maintenance.
6. FIRST AID October 27 – October 29, 1999. Certified.
EDUCATION QUALIFICATION
1. Politeknik Negeri Samarinda Jurusan: Teknik Elektro, 1994 – 1996. IPK 2.55.
2. Sekolah Teknologi Menengah Negeri Balikpapan, 1990 – 1993.
INTEREST
Automation technology information.
Reading Computer and technology Magazine.
Fishing and soccer sport.