RSS

Job Vacancy Mining: PT Borneo Alam Semesta (BAS)

25 Nov

deadline: 8 December 2011

PT. Borneo Alam Semesta adalah Kontraktor dibidang Pertambangan. Saat ini kami sedang membuka kesempatan untuk bekerja di project kami di Kalimantan dengan posisi sebagai sebagai berikut :

Geologis/ Kode: (GEO)

– Sarjana S1 Geologi.
– Berpengalaman dalam bidang eksplorasi dan evaluasi batu-bara minimum 3 tahun.
– Cakap dalam mengoperasikan software autocad, surpac, dan minescape.
– Cakap dalam menginteprasikan dan menampilkan laporan data explorasi.
– Bersedia ditugaskan ke lapangan/ area tambang.

Untuk lamaran kerja, CV, dan semua dokumen dikirimkan ke alamat email perusahaan serta dikirim paling lambat 8 Desember 2011 ke PT. BORNEO ALAM SEMESTA : PO BOX 1315/ JKU 14013 atau kirim ke recruitment@bas-mining.co.id (max 300kb).

“Hanya kepada pelamar yang memenuhi persyaratan di atas akan dipanggil untuk mengikuti proses seleksi”

 
2 Comments

Posted by on November 25, 2011 in Experience, Fresh Graduate, Mining

 

Tags: , , , , , , , ,

2 responses to “Job Vacancy Mining: PT Borneo Alam Semesta (BAS)

  1. gabby

    December 8, 2011 at 8:10 am

    semuanya berpengalaman T_T gak ada yg fresh gradute …

     
  2. eka nurhayanto

    December 23, 2011 at 2:00 pm

    Saya berminat untuk electrical.

    Berikut CV Saya :

    Name : Eka Nurhayanto
    Address : Perumahan Bumi Rengganis Blok 10C No.35 Rt 95 Gn.Bahagia,
    Balikpapan, Kalimantan Timur.
    HP : 08164588067
    E-mail : Enurhayanto@gmail.com

    PERSONAL INFORMATION
    Date of birth : October 3¬rd, 1975
    Place of birth : Balikpapan
    Marital Status : Married
    Children : 1

    CAREER OBJECTIVE
    Exploring opportunities to apply extensive experience in Electrical engineering and Control systems in a challenging career environment where strong communication, troubleshooting, and performance optimization skills can be effectively utilized.

    PROFESSIONAL SKILLS
    • More Thirteen years of Industrial Electrician.
    • Have good skills in:
     PLC, RSView32, Panel View and the other SCADA system.
     RSLogix5, RSLogix500, RSLogic500, and AI Series Software.
     ABB 800XA
     SIGMA UOI/UPM
     Distributed Power System Automax From Reliance with Access 4000 from CTC.
     More than 600 I/O of programmable logic has created.
    • Have good skills in Universal Frequency Drive (inverter) for many manufactures.
    • 220V to 3300 V, 0.5 kW to 1600 kW Electrical Motor and Starter with Protection equipment’s.
    • Experience in Electrical Distribution from 11 kV to 3.3 kV, 660V and 380 V.
    • Experience in turbine generator 2 x 65 MW, 11 kV, Wabash Diesel Generator 5 x 2.5 MW, Caterpillar, Cummins and Olympian.
    • Experience in Over head crane Canco, Morris, Kone. P&H Portal Crane and Kroll Crane.
    • Experience in conveyor system and ship loader system.
    • Experience in flow meter, pneumatic, Solenoid valve.
    • Good command in English and proficient in Microsoft Office, Visio Drawing and the internet.

    PROFESSIONAL EXPERIENCE
    PT.Kutai Chip Mill
    Chip Industries
    Electrical Engineer, August 2011 – November 2011
    Job description:
    • Take a lead role in ensuring a safety work ethic the implementation.
    • Received and evaluate work order and request for installation of a modification to a various electrical systems, peripheral systems and equipment including, estimating cost and time, deification of work orders, delegating tasks, determining necessary action and approving work orders.
    • Establishes and maintains a preventive maintenance and emergency response service to including maintaining on-calls list and schedules and evaluating effectiveness.
    • Develop and maintain a current STP data base for Mill wide areas.
    • Develop a file of standard planes for regularly recurring repair jobs, based on historical experiences.
    • Lead a team for an expansion and fabrication.
    • Observing and arranging the electrical system and equipment maintenance.
    • Research the Electrical system and equipments shortage for effectively Production.
    • Arrange the Preventive maintenance schedule.
    • To perform other related tasks/duties as directed by immediate management line.

    PT. Kertas Nusantara
    Pulp Industries
    Senior Supervisory, December 2010 – August 2011
    Job description:
    • Take a lead role in ensuring a safety work ethic the implementation.
    • Received and evaluate work order and request for installation of a modification to a various electrical systems, peripheral systems and equipment including, estimating cost and time, deification of work orders, delegating tasks, determining necessary action and approving work orders.
    • Establishes and maintains a preventive maintenance and emergency response service to including maintaining on-calls list and schedules and evaluating effectiveness.
    • Develop and maintain a current STP data base for Chemical and Air Separator Plant areas.
    • Develop and maintain a current STP data base for Pulp Machine and Bale Finishing Plant areas.
    • Develop a file of standard planes for regularly recurring repair jobs, based on historical experiences.
    • Lead a team for an expansion and fabrication.
    • Observing and arranging the electrical system and equipment maintenance.
    • Research the Electrical system and equipments shortage for effectively Production.
    • Arrange the Preventive maintenance schedule.
    • To perform other related tasks/duties as directed by immediate management line.

    Supervisory, November 2007 – December2010
    Job description:
    • Take a lead role in ensuring a safety work ethic the implementation.
    • Received and evaluate work order and request for installation of a modification to a various electrical systems, peripheral systems and equipment including, estimating cost and time, deification of work orders, delegating tasks, determining necessary action and approving work orders.
    • Establishes and maintains a preventive maintenance and emergency response service to including maintaining on-calls list and schedules and evaluating effectiveness.
    • Develop and maintain a current STP data base for Chemical and Air Separator Plant areas
    • Develop a file of standard planes for regularly recurring repair jobs, based on historical experiences.
    • Lead a team for an expansion and fabrication.
    • Observing and arranging the electrical system and equipment maintenance.
    • Research the Electrical system and equipments shortage for effectively Production.
    • Arrange the Preventive maintenance schedule.
    • To perform other related tasks/duties as directed by immediate management line.

    Shift Senior Technician, January, 2005 – November 2007
    Jobs description:
    • Preventive maintenance and troubleshooting of all Electrical system and equipment’s on Mill Wide areas for continues production, include:
     Power Distribution Plants, such:
     Power boiler plant.
     Recovery boiler plant.
     Evaporator plant.
     Recaust and lime kiln Plant.
     Cooling tower plant.
     Water intake, water treatment and water effluent plant.
     Wood Processing Plants, such:
     Kroll crane.
     Portal Crane.
     Chipping and conveyor line.
     Barking and conveyor line.
     Pulping Plants, such:
     Digester Plant.
     Washing Plant.
     Bleaching Plant.
     Pulp Machine Plant, such:
     Pulp machine.
     Dryer machine.
     Bale Finishing conveyor.
     Chemical and Air Separator Plant, such:
     Chlorate Plant.
     Chloralkali Plant.
     Salt Conveyor.
     Brine ion exchanger plant
     SO2 Plant.
     HCL Plant.
     Air Separator Plant.
    • Main Control Central, 0.5 to 1600 k Watt motor starters with protection system.
    • Variable Frequency Drive Reliance, Toshiba, Allen Bradley and Siemens.
    • Power Distribution System from 11kV to 3300V and 380V.
    • Maintain the control system using SLC 150 Allen Bradley, SLC 500 Allen Bradley with RS Logix500 Software, PLC-5 Allen Bradley with RS Logix5 Software and Simatic5 Siemens.

    Technician, July 2003 – January 2005
    Job description:
    • Preventive maintenance of all Electrical system and equipment’s on Pulp Machine and Bale Finishing section for continues production, such :
     Main Control Central, 0.5 to 1600 k Watt motor starters with protection system.
     Variable Frequency Drive Reliance, Toshiba, Allen Bradley and Siemens.
     Power Distribution System from 11kV to 3300V and 380V.
    • Maintain the control system used SLC 150 Allen Bradley, SLC 500 Allen Bradley with RS Logix500 Software, PLC5 Allen Bradley with RS Logix5 Software, Automax Sigma UOI/UPM, Access 4000, Panel View and RSView32.
    • Monitored electrical equipment working performance.
    • To perform other related tasks/duties as directed by immediate management line.
    • Expansion and fabrication.

    Technician Tradesman, October 2000 – July 2003
    Job Description:
    • Preventive maintenance of all Electrical system and equipment’s on all areas by shift work for continues production, such :
     Main Control Central, 0.5 to 1600 k Watt motor starters with protection system.
     Variable Frequency Drive Reliance, Toshiba, Allen Bradley and Siemens.
     Power Distribution System from 11kV to 3300V and 380V.
    • Maintain the control system using SLC 150 Allen Bradley, SLC 500 Allen Bradley with RS Logix500 Software, PLC-5 Allen Bradley with RS Logix5 Software and Simatic5 Siemens.
    • Assist technician crew to troubleshooting for all electrical equipment in mill.

    Technician Apprentice August 1998 – October 2000
    Job Description:
    • Preventive maintenance of all electrical equipment in Water Intake and Water Treatment Areas, Control system used PLC-5 Allen Bradley with A.I Series Software.
    • Maintain the Variable Frequency Drive Toshiba and Allen Bradley.
    • Assist technician crew to troubleshooting for all electrical equipment in mill.

    CV.Dodivan Utama, Contractor project VICO Indonesia
    Instrument Technician July 1997 – September 1997
    Job Decription:
    • Relocation DCS.
    TRAINING
    1. PLC Basic Training, March 22 – April 05, 1999 ( 40 Hours ) non Certified
    2. Maintaining and Troubleshooting A PLC-5 System Using RS Logix5 Software, May 12, 2000 (24 Hours) Certified.
    3. PLC-5 using RS Logix 5 Software and RS View32 (32 Hours) Certified.
    4. Transformer and Rectifier 90 k Amp. (16 Hours) Without certificate.
    5. MIMS OE for maintenance.
    6. FIRST AID October 27 – October 29, 1999. Certified.

    EDUCATION QUALIFICATION
    1. Politeknik Negeri Samarinda Jurusan: Teknik Elektro, 1994 – 1996. IPK 2.55.
    2. Sekolah Teknologi Menengah Negeri Balikpapan, 1990 – 1993.

    INTEREST
    Automation technology information.
    Reading Computer and technology Magazine.
    Fishing and soccer sport.

     

Leave a comment